We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. Read more…
Senica Biogas

Senica Biogas

Poblacion, Carmen, 6005, Philippines

Get Directions

+63 939 937272

Categories
Work hours Add information
About Thermal Power Plant
Steel Structures
Horizontal Vertical Construction
Installer of Large Biogas Reactor
Assembles Bio-Electric Generator Sets
Senica Biogas cover
Description SPECIALTY

A. MECHANICAL

1. THERMAL POWER PLANT

2. GAS TURBINE POWER PLANT

3. ELECTRO MECHANICAL PIPING WORKS

4. PIPING WATERLINE

5. GAS STORAGE TANK

6. CONCRETE CYLINDRICAL WATER RESERVOIR

7. BELT CONVEYOR

8. CONSTRUCTION OF BIOGAS REACTOR

B. CIVIL

1. ROAD CONCRETING

2. STORAGE HOUSE

3. GYMNASIUM

4. COMMERCIAL BUILDING

5. RESIDENTIAL BUILDING

C. STRUCTURAL

1. FABRICATION & INSTALLATION OF STEEL STRUCTURE,

TANK AND PIPINGS

D. ELECTRICAL

1. INDUSTRIAL

2. RESIDENTIAL

E. HEAVY LIFTING / RIGGING

1. PREPARATION OF PLAN AND RIGGING STUDY
Awards Awards / Merits / Trainings:

1. ACADEMIC SCHOLAR (COMPETITIVE) : 1976 – 1981

Sponsored by: : Lianga Bay Logging Company Inc.

Benefactor : Mr. &b Mrs. Jake Jacobson

Diatagon, Lianga Surigao del Sur

P.O. Box 49909 U.S.A

2. Passed the PRC – Professional Regulation Commission of Mechanical Engineering Board Examination.

3. Company Sponsored Training for PERT CPM Nov. 1982 to May 1983 – CDCP/PNCC.

4. Fabrication and Installation/Erection of Titanium Piping.

5. Fabrication and Installation/Erection of Petro Chemical Piping.

6. Fabrication and Installation of Electro Mechanical Power Piping, Gas and Oil Facilities, well

Head Pipe Hook Up, Hot Tapping, Steam Blowing, Pigging and Hydrotesting.

7. Fabrication and Installation of In-Plant, Off-Plot / On-Plot, On-Shore / Off Shore Pipings And Associated Instrumentation works.


Code And Standards:

ANSI / ASME B31.1 – B31.2 – B31.3 – B31.4 – B31.8
API-1104 FLOW LINE WELDING AND INSPECTION, BS-DEP-34-51-01-31, BS-64-51-01-31.

Similar places nearby