Les cookies nous permettent de personnaliser le contenu et les annonces, d'offrir des fonctionnalités relatives aux médias sociaux et d'analyser notre trafic. En savoir plus…
112 Orion Street, Brunswick, Maine, 04011
Heures
LU 08:00 – 17:00 SA Fermé
MA 08:00 – 17:00 DI Fermé
ME 08:00 – 17:00
JE 08:00 – 17:00
VE 08:00 – 17:00
À propos STARC Systems
Description
The STARC containment system segregates the noise and dust of renovations, so you can continue with your critical work without disruption. The installation process is quick and quiet. Sound attenuating panels reduce renovation noise by up to 50%. The airtight system with proper installation exceeds ICRA Class IV requirements. Superior durability provides years of reduced labor and material containment costs—saving you money.
Fondée
2011
Produits
temporary wall systems, dust containment systems, temporary modular walls, dust containment walls, temporary construction barriers

Achats à Brunswick, États-Unis

Matériaux de construction 1